Permit: TR-ROW-0525-00738
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
3210 N FREEWAY INDUSTRIAL LP
Address NEW:
3210 N FREEWAY INDUSTRIAL LP
Apply Date:
05/28/2025
Applicant:
Description:
324058 Site 2 - Install Approximately 296LF of 10" Cured in Place Pipe. New concrete collars and bench rehab's will be completed on MH's 4735-03 and MH 4735-02 per PCRWRD standard detail 211.
Permit Reviews
Permit Number - TR-ROW-0525-00738
Permit Status: Complete
Permit Description: 324058 Site 2 - Install Approximately 296LF of 10" Cured in Place Pipe. New concrete collars and bench rehab's will
be completed on MH's 4735-03 and MH 4735-02 per PCRWRD standard
detail 211.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/28/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/29/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0525-00738
Permit Status: Complete
Permit Description: 324058 Site 2 - Install Approximately 296LF of 10" Cured in Place Pipe. New concrete collars and bench rehab's will
be completed on MH's 4735-03 and MH 4735-02 per PCRWRD standard
detail 211.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/29/2025 | ADOT vs COT ROW |
| 05/29/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0525-00738
Permite Description: 324058 Site 2 - Install Approximately 296LF of 10" Cured in Place Pipe. New concrete collars and bench rehab's will
be completed on MH's 4735-03 and MH 4735-02 per PCRWRD standard
detail 211.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2025 | TRSP - ROW - Final | N/A | Deferred |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0525-00738
Permit Description: 324058 Site 2 - Install Approximately 296LF of 10" Cured in Place Pipe. New concrete collars and bench rehab's will
be completed on MH's 4735-03 and MH 4735-02 per PCRWRD standard
detail 211.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/08/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/08/2025 | TRSP - ROW - Barricade Takedown | Passed |