Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
1315 W SPEEDWAY BL
Apply Date:
05/28/2025
Applicant:
Andrew Ruiz
Description:
ROW PERMIT REQUIRED FOR STREET WORK. ASPHALT REMOVAL & HYDROEXCAVATION TO EXPOSE UTILITIES FOR 3RD PARTY CONTRACTOR.

Permit Reviews

Permit Number - TR-ROW-0525-00736
Permit Status: Complete
Permit Description: ROW PERMIT REQUIRED FOR STREET WORK. ASPHALT REMOVAL & HYDROEXCAVATION TO EXPOSE UTILITIES FOR 3RD PARTY CONTRACTOR.
Start Date Submittal Complete Date Status  
07/07/2025 RIGHT-OF-WAY REVIEW REVISION v.1 07/07/2025 APPROVED Review Details
05/28/2025 RIGHT-OF-WAY REVIEW v.1 06/10/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0525-00736
Permit Status: Complete
Permit Description: ROW PERMIT REQUIRED FOR STREET WORK. ASPHALT REMOVAL & HYDROEXCAVATION TO EXPOSE UTILITIES FOR 3RD PARTY CONTRACTOR.
Total Outstanding Activity Conditions - 5
Date Name
05/29/2025 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
05/29/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
05/29/2025 Traffic control set-up approved between 9AM - 3:30PM
07/07/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
07/07/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0525-00736
Permit Description: ROW PERMIT REQUIRED FOR STREET WORK. ASPHALT REMOVAL & HYDROEXCAVATION TO EXPOSE UTILITIES FOR 3RD PARTY CONTRACTOR.
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/17/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/14/2025 TRSP - ROW - Barricade - Setup/Routine Passed
07/18/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
07/29/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
AEX CONSULTANTS - 1315 W SPEEDWAY BLVD - LEFT LN CL PLAN 2 - SPEEDWAY BLVD - YUCCA ST_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
AEX CONSULTANTS - 1315 W SPEEDWAY BLVD - LEFT TURN BAY CL - SPEEDWAY BLVD - YUCCA ST_V1.PDF DOCUMENTS VIEW
JOBSITE AERIAL VIEW_V1.PDF DOCUMENTS VIEW