Permit: TR-ROW-0525-00730
Permit Details
Apply Date:
05/27/2025
Applicant:
Alexander Gipson
Description:
Three lane closure required to provide safe working conditions and space for sewer lining equipment for repair to sewer. (Note: Night Work 6pm - 6 am)
Permit Reviews
Permit Number - TR-ROW-0525-00730
Permit Status: Complete
Permit Description: Three lane closure required to provide safe working conditions and space for sewer lining equipment for repair to sewer.
(Note: Night Work 6pm - 6 am)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/28/2025 | RIGHT-OF-WAY REVIEW v.1 | 06/03/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0525-00730
Permit Status: Complete
Permit Description: Three lane closure required to provide safe working conditions and space for sewer lining equipment for repair to sewer.
(Note: Night Work 6pm - 6 am)
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 05/28/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER |
| 05/29/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION |
| 05/29/2025 | The following extended traffic control set-up times were approved: 6 pm to 6 am. First TC device at 6 pm, and off road by 6am. |
| 05/29/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. |
| 05/29/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/29/2025 | Approved Temporary Noise Exemption required prior to Night work being performed within the City of Tucson Right of Way.. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0525-00730
Permit Description: Three lane closure required to provide safe working conditions and space for sewer lining equipment for repair to sewer.
(Note: Night Work 6pm - 6 am)
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |