Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
129 N EUCLID AV
Address NEW:
129 N EUCLID AV
Apply Date:
05/22/2025
Applicant:
CAITLIN RIPLEY - SOUTHWEST BARRICADES
Description:
The address on the plan set does not pull in your system, we added the location based on the parcel number. PLACE NEW ANCHOR

Permit Reviews

Permit Number - TR-ROW-0525-00718
Permit Status: Complete
Permit Description: The address on the plan set does not pull in your system, we added the location based on the parcel number. PLACE NEW ANCHOR
Start Date Submittal Complete Date Status  
05/22/2025 RIGHT-OF-WAY REVIEW v.1 05/23/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0525-00718
Permit Status: Complete
Permit Description: The address on the plan set does not pull in your system, we added the location based on the parcel number. PLACE NEW ANCHOR
Total Outstanding Activity Conditions - 4
Date Name
05/22/2025 PRE-CON/PAVEMENT/SIDEWALK
05/22/2025 Traffic control set-up approved between 9AM - 3:30PM
05/23/2025 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2.
05/23/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0525-00718
Permit Description: The address on the plan set does not pull in your system, we added the location based on the parcel number. PLACE NEW ANCHOR
Total Completed Inspections - 5
Date Description Inspector Results Comments
07/29/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
08/05/2025 TRSP - ROW - Barricade - Setup/Routine Passed
08/05/2025 TRSP - ROW - Barricade Takedown Passed
08/05/2025 TRSP - ROW - Final Passed
08/05/2025 TRSP - ROW - Backfill - Placement/Compaction Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
CROWN CASTLE- S247639 - POLE 265 - ANCHOR - PLANS - 5.21.25_V1.PDF DOCUMENTS VIEW
CROWN CASTLE- S247639 - POLE 265 - ANCHOR - TCP - 5.21.25_V1.PDF DOCUMENTS VIEW