Permit: TR-ROW-0525-00717
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4880 E 29TH ST BLDG 1
Address NEW:
4880 E 29TH ST BLDG 1
Apply Date:
05/22/2025
Applicant:
ANGEL MORALES
Description:
Emergency manhole rebuild 4’ wide. 6’ to 14’ deep. 100’ long Mostly of the work will be behind the curb *** Permit update 6/25/2025: Permit renewed for 90 days as of 6/27/2025.
Permit Reviews
Permit Number - TR-ROW-0525-00717
Permit Status: Complete
Permit Description: Emergency manhole rebuild 4’ wide. 6’ to 14’ deep. 100’ long
Mostly of the work will be behind the curb ***
Permit update 6/25/2025: Permit renewed for 90 days as of 6/27/2025.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/22/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/22/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0525-00717
Permit Status: Complete
Permit Description: Emergency manhole rebuild 4’ wide. 6’ to 14’ deep. 100’ long
Mostly of the work will be behind the curb ***
Permit update 6/25/2025: Permit renewed for 90 days as of 6/27/2025.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 03/28/2023 | Please contact Pima County Addressing to resolve your addressing issue related to TC-COM-0223-00696. Addressing@pima.gov or 520-724-9512 |
| 05/22/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 05/22/2025 | The following extended traffic control set-up times were approved: 24hrs Traffic Control Setup only, for Pedestrian detour path access route accommodations |
| 05/22/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. |
| 05/22/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0525-00717
Permit Description: Emergency manhole rebuild 4’ wide. 6’ to 14’ deep. 100’ long
Mostly of the work will be behind the curb ***
Permit update 6/25/2025: Permit renewed for 90 days as of 6/27/2025.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Traffic control follows the approved TCP. | |
| 06/30/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Contractor spoke with Mike Braven over the phone | |
| 12/24/2025 | TRSP - ROW - Final | Passed | I am passing this permit to close it out, contractor has a new permit for this project TR-ROW-0925-01170. |