Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
7510 E 22ND ST
Address NEW:
7510 E 22ND ST
Apply Date:
05/21/2025
Applicant:
Bryan Guinee
Description:
The contractor will be installing cameras onto light poles for the Tucson Police Department. Shadow Truck less than an hour per location. 60 DAY PERMIT

Permit Reviews

Permit Number - TR-ROW-0525-00712
Permit Status: Complete
Permit Description: The contractor will be installing cameras onto light poles for the Tucson Police Department. Shadow Truck less than an hour per location. 60 DAY PERMIT
Start Date Submittal Complete Date Status  
05/22/2025 RIGHT-OF-WAY REVIEW v.1 05/23/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0525-00712
Permit Status: Complete
Permit Description: The contractor will be installing cameras onto light poles for the Tucson Police Department. Shadow Truck less than an hour per location. 60 DAY PERMIT
Total Outstanding Activity Conditions - 6
Date Name
05/23/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
05/23/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
05/23/2025 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2.
05/23/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/23/2025 Traffic control set-up approved between 9AM - 3:30PM
05/23/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0525-00712
Permit Description: The contractor will be installing cameras onto light poles for the Tucson Police Department. Shadow Truck less than an hour per location. 60 DAY PERMIT
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/21/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work is complete
07/21/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Work is complete
07/21/2025 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
15. MAP 22ND - PRUDENCE_V1.PDF DOCUMENTS VIEW
15. TCP_NEXT 22ND - PRUDENCE_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW