Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
3701 E 3RD ST BLDG 2
Apply Date:
05/16/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
excavate and install 1-4'' HCS (30LF), ELECTRICAL TRENCH (120 LF) parking lot site grading and paving, and one new trash enclosure build.

Permit Reviews

Permit Number - TR-ROW-0525-00674
Permit Status: Complete
Permit Description: excavate and install 1-4'' HCS (30LF), ELECTRICAL TRENCH (120 LF) parking lot site grading and paving, and one new trash enclosure build.
Start Date Submittal Complete Date Status  
05/16/2025 RIGHT-OF-WAY REVIEW v.1 05/19/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0525-00674
Permit Status: Complete
Permit Description: excavate and install 1-4'' HCS (30LF), ELECTRICAL TRENCH (120 LF) parking lot site grading and paving, and one new trash enclosure build.
Total Outstanding Activity Conditions - 2
Date Name
05/19/2025 Traffic Control set-up approved between 7AM - 5PM
05/19/2025 DODGE BL IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0525-00674
Permit Description: excavate and install 1-4'' HCS (30LF), ELECTRICAL TRENCH (120 LF) parking lot site grading and paving, and one new trash enclosure build.
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/30/2025 TRSP - ROW - Barricade - Setup/Routine Passed
06/30/2025 TRSP - ROW - Paving - Subgrade/removal/placement Passed
06/30/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/30/2025 TRSP - ROW - Final Passed