Permit: TR-ROW-0525-00659
Permit Details
Apply Date:
05/13/2025
Applicant:
Christian Celaya
Description:
Renew in 90 days as of 06/13/2025 new expiration date 09/11/2025 The contractor will be removing and replacing damage conduit for Robert Stineman for the City of Tucson. Traffic Control request 7:00am to 3:30pm.
Permit Reviews
Permit Number - TR-ROW-0525-00659
Permit Status: Complete
Permit Description: Renew in 90 days as of 06/13/2025 new expiration date 09/11/2025
The contractor will be removing and replacing damage conduit for Robert Stineman for the City of Tucson.
Traffic Control request 7:00am to 3:30pm.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/14/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/15/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0525-00659
Permit Status: Complete
Permit Description: Renew in 90 days as of 06/13/2025 new expiration date 09/11/2025
The contractor will be removing and replacing damage conduit for Robert Stineman for the City of Tucson.
Traffic Control request 7:00am to 3:30pm.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/14/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 05/14/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 05/14/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 05/14/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0525-00659
Permit Description: Renew in 90 days as of 06/13/2025 new expiration date 09/11/2025
The contractor will be removing and replacing damage conduit for Robert Stineman for the City of Tucson.
Traffic Control request 7:00am to 3:30pm.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work is complete | |
| 07/17/2025 | TRSP - ROW - Final | Passed | Work is complete |