Permit: TR-ROW-0525-00639
Permit Details
Apply Date:
05/09/2025
Applicant:
CAITLIN RIPLEY - SOUTHWEST BARRICADES
Description:
New 4-Inch HCS Connection
Permit Reviews
Permit Number - TR-ROW-0525-00639
Permit Status: Issued
Permit Description: New 4-Inch HCS Connection
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/28/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 05/28/2025 | REQUIRES RESUBMIT |
| 05/29/2025 | RIGHT-OF-WAY REVIEW REVISION v.2 | 05/30/2025 | APPROVED |
| 05/20/2025 | RIGHT-OF-WAY REVIEW v.2 | 05/21/2025 | APPROVED |
| 05/09/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/09/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0525-00639
Permit Status: Issued
Permit Description: New 4-Inch HCS Connection
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 05/09/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 05/09/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/21/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 05/21/2025 | OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP |
| 05/21/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. |
| 05/21/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-ROW-0525-00639
Permite Description: New 4-Inch HCS Connection
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Issued
Permit Number: TR-ROW-0525-00639
Permit Description: New 4-Inch HCS Connection
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/23/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/02/2025 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 06/04/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/04/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed |