Permit: TR-ROW-0525-00625
Permit Details
Apply Date:
05/07/2025
Applicant:
Description:
324044 Site 1 - Install a new 8" PVC sewer line from MH 8583-20 to MH 9907-11. Reconstruct the benches in both manholes. Replace concrete collars on both manholes.
Permit Reviews
Permit Number - TR-ROW-0525-00625
Permit Status: Complete
Permit Description: 324044 Site 1 - Install a new 8" PVC sewer line from MH 8583-20 to MH 9907-11. Reconstruct the benches in both manholes. Replace concrete collars on both manholes.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/07/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/08/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0525-00625
Permit Status: Complete
Permit Description: 324044 Site 1 - Install a new 8" PVC sewer line from MH 8583-20 to MH 9907-11. Reconstruct the benches in both manholes. Replace concrete collars on both manholes.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/07/2025 | The following extended traffic control set-up times were approved: |
| 05/07/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 05/08/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0525-00625
Permite Description: 324044 Site 1 - Install a new 8" PVC sewer line from MH 8583-20 to MH 9907-11. Reconstruct the benches in both manholes. Replace concrete collars on both manholes.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0525-00625
Permit Description: 324044 Site 1 - Install a new 8" PVC sewer line from MH 8583-20 to MH 9907-11. Reconstruct the benches in both manholes. Replace concrete collars on both manholes.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/31/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 11/03/2025 | TRSP - ROW - Final | Passed |