Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
3155 E GRANT RD
Address NEW:
3155 E GRANT RD
Apply Date:
05/05/2025
Applicant:
Benjamin Lozano - Border Traffic Safety LLC
Description:
Need a lane closure and side walk detour for paving private property. Traffic Control has been approved for 24hrs for Right lane closure to accommodated Pedestrian detour route

Permit Reviews

Permit Number - TR-ROW-0525-00597
Permit Status: Complete
Permit Description: Need a lane closure and side walk detour for paving private property. Traffic Control has been approved for 24hrs for Right lane closure to accommodated Pedestrian detour route
Start Date Submittal Complete Date Status  
05/05/2025 RIGHT-OF-WAY REVIEW v.1 05/06/2025 APPROVED Review Details
05/21/2025 RIGHT-OF-WAY REVIEW REVISION v.1 05/22/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0525-00597
Permit Status: Complete
Permit Description: Need a lane closure and side walk detour for paving private property. Traffic Control has been approved for 24hrs for Right lane closure to accommodated Pedestrian detour route
Total Outstanding Activity Conditions - 6
Date Name
05/05/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
05/05/2025 Traffic control set-up approved between 9AM - 3:30PM
05/06/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION
05/06/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/06/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
05/22/2025 The following extended traffic control set-up times were approved:

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0525-00597
Permit Description: Need a lane closure and side walk detour for paving private property. Traffic Control has been approved for 24hrs for Right lane closure to accommodated Pedestrian detour route
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/08/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/25/2025 TRSP - ROW - Barricade - Setup/Routine Passed
06/25/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
DOC07425120250521122819_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
DOC07338420250505084621_V1.PDF DOCUMENTS VIEW
DOC07338520250505084628_V1.PDF DOCUMENTS VIEW