Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2015 E ELM ST
Address NEW:
2015 E ELM ST
Apply Date:
05/30/2024
Applicant:
Jim Foster
Description:
REPLACING SEWER LINE FROM FOUNDATION TO COUNTY MAIN LOCATED IN CENTER OF ELM ST.

Permit Reviews

Permit Number - TR-ROW-0524-00642
Permit Status: Complete
Permit Description: REPLACING SEWER LINE FROM FOUNDATION TO COUNTY MAIN LOCATED IN CENTER OF ELM ST.
Start Date Submittal Complete Date Status  
05/30/2024 RIGHT-OF-WAY REVIEW v.1 05/30/2024 REQUIRES RESUBMIT Review Details
06/10/2024 RIGHT-OF-WAY REVIEW v.2 06/12/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0524-00642
Permit Status: Complete
Permit Description: REPLACING SEWER LINE FROM FOUNDATION TO COUNTY MAIN LOCATED IN CENTER OF ELM ST.
Total Outstanding Activity Conditions - 2
Date Name
06/10/2024 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.
06/10/2024 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0524-00642
Permit Description: REPLACING SEWER LINE FROM FOUNDATION TO COUNTY MAIN LOCATED IN CENTER OF ELM ST.
Total Completed Inspections - 5
Date Description Inspector Results Comments
06/18/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/27/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
07/03/2024 TRSP - ROW - Paving - Subgrade/removal/placement Passed
07/09/2024 TRSP - ROW - Barricade Takedown Passed
07/09/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
2015 E ELM ST SEWER REPLACEMENT._V1.PDF DOCUMENTS VIEW
PIONEER PLUMBING - 2015 E ELM ST - 2 WAY FLAGGING STATION - PENDING_V1.PDF DOCUMENTS VIEW