Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4206 N 1ST AV
Address NEW:
4206 N 1ST AV
Apply Date:
05/28/2024
Applicant:
Armando Bracamonte
Description:
The contractor will be modifying the traffic signals for Armando Bracamonte for the city of Tucson. Sidewalk will be available for pedestrians. Traffic control 6:00am to 6:00pm. 90 day permit

Permit Reviews

Permit Number - TR-ROW-0524-00636
Permit Status: Complete
Permit Description: The contractor will be modifying the traffic signals for Armando Bracamonte for the city of Tucson. Sidewalk will be available for pedestrians. Traffic control 6:00am to 6:00pm. 90 day permit
Start Date Submittal Complete Date Status  
05/28/2024 RIGHT-OF-WAY REVIEW v.1 05/30/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0524-00636
Permit Status: Complete
Permit Description: The contractor will be modifying the traffic signals for Armando Bracamonte for the city of Tucson. Sidewalk will be available for pedestrians. Traffic control 6:00am to 6:00pm. 90 day permit
Total Outstanding Activity Conditions - 2
Date Name
05/29/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
05/29/2024 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0524-00636
Permit Description: The contractor will be modifying the traffic signals for Armando Bracamonte for the city of Tucson. Sidewalk will be available for pedestrians. Traffic control 6:00am to 6:00pm. 90 day permit
Total Completed Inspections - 5
Date Description Inspector Results Comments
06/04/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
08/29/2024 TRSP - ROW - Barricade - Setup/Routine Passed
08/29/2024 TRSP - ROW - Barricade Takedown Passed
08/29/2024 TRSP - ROW - Final/Close-Out Passed
08/29/2024 TRSP - ROW - AERIAL INSTALLATION Passed