Permit: TR-ROW-0524-00548
Permit Details
Apply Date:
05/08/2024
Applicant:
BEN LOZANO
Description:
INSTALLATION OF FIBER OPTIC CABLING FOR THE CITY OF TUCSON. AERIAL PATHWAY . PATHWAY IS ON THE NORTH SIDE OF 36TH STREET
Permit Reviews
Permit Number - TR-ROW-0524-00548
Permit Status: Complete
Permit Description: INSTALLATION OF FIBER OPTIC CABLING FOR THE CITY OF TUCSON.
AERIAL PATHWAY . PATHWAY IS ON THE NORTH SIDE OF 36TH STREET
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/09/2024 | RIGHT-OF-WAY REVIEW v.2 | 05/13/2024 | APPROVED |
05/08/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/09/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0524-00548
Permit Status: Complete
Permit Description: INSTALLATION OF FIBER OPTIC CABLING FOR THE CITY OF TUCSON.
AERIAL PATHWAY . PATHWAY IS ON THE NORTH SIDE OF 36TH STREET
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
05/08/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
05/08/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0524-00548
Permit Description: INSTALLATION OF FIBER OPTIC CABLING FOR THE CITY OF TUCSON.
AERIAL PATHWAY . PATHWAY IS ON THE NORTH SIDE OF 36TH STREET
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/21/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
06/21/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
06/21/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
06/21/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
06/21/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |