Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW)
Address:
1501 N ORACLE RD
Apply Date:
05/22/2023
Applicant:
Petr Chylik
Description:
PALM & TREE CARE ON COT MEDIAN ISLANDS – STREET ARTERIALS & COLLECTORS – MEDIAN ADJACENT LANES CLOSURE – ROLLING SET UP WITH MINIMUM RESTRICTIONS.

Permit Reviews

Permit Number - TR-ROW-0523-00796
Permit Status: Fees due
Permit Description: PALM & TREE CARE ON COT MEDIAN ISLANDS – STREET ARTERIALS & COLLECTORS – MEDIAN ADJACENT LANES CLOSURE – ROLLING SET UP WITH MINIMUM RESTRICTIONS.
Start Date Submittal Complete Date Status  
05/23/2023 RIGHT-OF-WAY REVIEW v.1 05/24/2023 APPROVED Review Details

Conditions

Permit Number - TR-ROW-0523-00796
Permit Status: Fees due
Permit Description: PALM & TREE CARE ON COT MEDIAN ISLANDS – STREET ARTERIALS & COLLECTORS – MEDIAN ADJACENT LANES CLOSURE – ROLLING SET UP WITH MINIMUM RESTRICTIONS.
Date Description Comments
05/23/2023 ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL * * PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
05/23/2023 Traffic control set-up approved between 9AM - 3:30PM

Documents

File Name Document Type  
DB TRAFFIC PLANS DIAGRAMS GENERIC PLAN FOR ALL ARETERIAL - COLLECTORS PAGE9 6-8-22_V1.PDF DOCUMENTS VIEW
COT ORACLE -MIRACLE MILE TO DRACHMAN MAP 6-25-21_V1.PDF DOCUMENTS VIEW