Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
3762 S CHESIN DR
Address NEW:
3762 S CHESIN DR
Apply Date:
05/22/2023
Applicant:
Diana Dominguez
Description:
Mill & Pave Residential Streets in 2 neighborhoods - FY21 Prop 101 Local Streets Package 8 Valley View East & Centennial Park (located on the NE Corner of Kolb Rd and Escalante Rd) Estes Park (located Broadway Bl & Old Spanish Trl and Gollob Rd and Cmo Seco) We will be starting in Area 1 on May 30, removing the existing curb and installing ADA ramps, we will proceed to Area 2 and do the same. Mid September we will start lowering the utilities and beginning of October we will Mill & Pave. All work should be completed by the end of November.

Permit Reviews

Permit Number - TR-ROW-0523-00794
Permit Status: Complete
Permit Description: Mill & Pave Residential Streets in 2 neighborhoods - FY21 Prop 101 Local Streets Package 8 Valley View East & Centennial Park (located on the NE Corner of Kolb Rd and Escalante Rd) Estes Park (located Broadway Bl & Old Spanish Trl and Gollob Rd and Cmo Seco) We will be starting in Area 1 on May 30, removing the existing curb and installing ADA ramps, we will proceed to Area 2 and do the same. Mid September we will start lowering the utilities and beginning of October we will Mill & Pave. All work should be completed by the end of November.
Start Date Submittal Complete Date Status  
05/23/2023 RIGHT-OF-WAY REVIEW v.1 07/19/2023 REQUIRES RESUBMIT Review Details
07/21/2023 RIGHT-OF-WAY REVIEW v.3 07/21/2023 APPROVED Review Details
07/20/2023 RIGHT-OF-WAY REVIEW v.2 07/21/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0523-00794
Permit Status: Complete
Permit Description: Mill & Pave Residential Streets in 2 neighborhoods - FY21 Prop 101 Local Streets Package 8 Valley View East & Centennial Park (located on the NE Corner of Kolb Rd and Escalante Rd) Estes Park (located Broadway Bl & Old Spanish Trl and Gollob Rd and Cmo Seco) We will be starting in Area 1 on May 30, removing the existing curb and installing ADA ramps, we will proceed to Area 2 and do the same. Mid September we will start lowering the utilities and beginning of October we will Mill & Pave. All work should be completed by the end of November.
Total Outstanding Activity Conditions - 1
Date Name
05/24/2023 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0523-00794
Permit Description: Mill & Pave Residential Streets in 2 neighborhoods - FY21 Prop 101 Local Streets Package 8 Valley View East & Centennial Park (located on the NE Corner of Kolb Rd and Escalante Rd) Estes Park (located Broadway Bl & Old Spanish Trl and Gollob Rd and Cmo Seco) We will be starting in Area 1 on May 30, removing the existing curb and installing ADA ramps, we will proceed to Area 2 and do the same. Mid September we will start lowering the utilities and beginning of October we will Mill & Pave. All work should be completed by the end of November.
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/27/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
02/26/2024 TRSP - ROW - Recurring Passed
02/26/2024 TRSP - ROW - Notice of Completion Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
SOU12871 RE-REVISED_V3.PDF DOCUMENTS VIEW
SOU12872 RE-REVISED_V3.PDF DOCUMENTS VIEW
SOU1294 REVISED_V2.PDF DOCUMENTS VIEW
AERIAL VIEW OF WORK AREA 1_V1.PDF DOCUMENTS VIEW
AERIAL VIEW OF WORK AREA 2_V1.PDF DOCUMENTS VIEW