Permit: TR-ROW-0523-00733
Permit Details
Apply Date:
05/10/2023
Applicant:
Armando Bracamonte
Description:
The contractor will be modifying Traffic Signals for Armando Bracamonte for the City of Tucson. Sidewalk will be available for pedestrians.
Permit Reviews
Permit Number - TR-ROW-0523-00733
Permit Status: Complete
Permit Description: The contractor will be modifying Traffic Signals for Armando Bracamonte for the City of Tucson. Sidewalk will be available for pedestrians.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/31/2023 | RIGHT-OF-WAY REVIEW v.2 | 06/02/2023 | APPROVED |
| 05/10/2023 | RIGHT-OF-WAY REVIEW v.1 | 05/11/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0523-00733
Permit Status: Complete
Permit Description: The contractor will be modifying Traffic Signals for Armando Bracamonte for the City of Tucson. Sidewalk will be available for pedestrians.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/31/2023 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/31/2023 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200 |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0523-00733
Permite Description: The contractor will be modifying Traffic Signals for Armando Bracamonte for the City of Tucson. Sidewalk will be available for pedestrians.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2024 | TRSP - ROW - SITE INSPECTION | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0523-00733
Permit Description: The contractor will be modifying Traffic Signals for Armando Bracamonte for the City of Tucson. Sidewalk will be available for pedestrians.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/27/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |