Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Apply Date:
05/09/2023
Applicant:
Alex Pratt
Description:
PLACE EQUIPMENT IN THE RIGHT OF WAY FOR PAVING AND SLURRY SEALING ON PRIVATE PROPERTY. *** PREV PERMIT TR-ROW-0223-00428

Permit Reviews

Permit Number - TR-ROW-0523-00726
Permit Status: Complete
Permit Description: PLACE EQUIPMENT IN THE RIGHT OF WAY FOR PAVING AND SLURRY SEALING ON PRIVATE PROPERTY. *** PREV PERMIT TR-ROW-0223-00428
Start Date Submittal Complete Date Status  
05/09/2023 RIGHT-OF-WAY REVIEW v.1 05/09/2023 REQUIRES RESUBMIT Review Details
05/09/2023 RIGHT-OF-WAY REVIEW v.2 05/15/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0523-00726
Permit Status: Complete
Permit Description: PLACE EQUIPMENT IN THE RIGHT OF WAY FOR PAVING AND SLURRY SEALING ON PRIVATE PROPERTY. *** PREV PERMIT TR-ROW-0223-00428
Total Outstanding Activity Conditions - 4
Date Name
05/10/2023 BUS STOP IN AREA, CONTACT SUN TRAN DISPATCH AT 520-206-8934 AND/OR BEAPAULUS AT 520-206-8826 AT LEAST 48-BUISNESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
05/10/2023 Traffic control set-up approved between 9AM - 3:30PM
05/10/2023 Pavement Patch Type Shall Be in Conformance to The Current Edition of The City of Tucson Public Utility Administrative Manual- Major Moratorium ROW
05/10/2023 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0523-00726
Permit Description: PLACE EQUIPMENT IN THE RIGHT OF WAY FOR PAVING AND SLURRY SEALING ON PRIVATE PROPERTY. *** PREV PERMIT TR-ROW-0223-00428
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/06/2023 TRSP - ROW - Final/Close-Out Passed
10/06/2023 TRSP - ROW - Recurring Passed
10/06/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
2660 N ALVERNON WAY P2- AVANI NORTH_V2.PDF DOCUMENTS VIEW
2660 N ALVERNON WAY SITE - AVANI NORTH_V2.PDF DOCUMENTS VIEW
2660 N ALVERNON WAY P1- AVANI NORTH_V2.PDF DOCUMENTS VIEW