Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Apply Date:
05/04/2023
Applicant:
Andres Amado
Description:
excavation in left most west bound lane to fix a broken water valve for the city of tucson water dept

Permit Reviews

Permit Number - TR-ROW-0523-00707
Permit Status: Complete
Permit Description: excavation in left most west bound lane to fix a broken water valve for the city of tucson water dept
Start Date Submittal Complete Date Status  
05/05/2023 RIGHT-OF-WAY REVIEW v.1 05/05/2023 REQUIRES RESUBMIT Review Details
05/12/2023 RIGHT-OF-WAY REVIEW v.2 05/23/2023 APPROVED Review Details

Conditions

Permit Number - TR-ROW-0523-00707
Permit Status: Complete
Permit Description: excavation in left most west bound lane to fix a broken water valve for the city of tucson water dept
Date Description Comments
05/05/2023 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0523-00707
Permit Description: excavation in left most west bound lane to fix a broken water valve for the city of tucson water dept
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/01/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/24/2023 TRSP - ROW - SITE INSPECTION Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
ACTION541_V2.PDF DOCUMENTS VIEW
ROW PERMIT MAP_V1.PDF DOCUMENTS VIEW