Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1161 N YUCCA ST
Address NEW:
1161 N YUCCA ST
Apply Date:
04/30/2026
Applicant:
Erica Goldston
Description:
Temporary above ground sewer bypass to complete sewer work outside of City Right-of-Way.

Permit Reviews

Permit Number - TR-ROW-0426-00522
Permit Status: Complete
Permit Description: Temporary above ground sewer bypass to complete sewer work outside of City Right-of-Way.
Start Date Submittal Complete Date Status  
05/01/2026 RIGHT-OF-WAY REVIEW v.1 05/11/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0426-00522
Permit Status: Complete
Permit Description: Temporary above ground sewer bypass to complete sewer work outside of City Right-of-Way.
Total Outstanding Activity Conditions - 6
Date Name
05/06/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to the Historic Preservation Office, City of Tucson, PO BOX 27210, Tucson AZ 85726...***Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
05/06/2026 Traffic Control set-up approved between 7AM - 5PM
05/06/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
05/06/2026 UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
05/06/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
05/06/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0426-00522
Permit Description: Temporary above ground sewer bypass to complete sewer work outside of City Right-of-Way.
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/17/2026 TRSP - ROW - Barricade - Setup/Routine Passed Inspection not needed old permit closing all work has been done
06/17/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Old permit talk to Hunter they had a a regime change in their project manager group. These are old permits were closing.
06/17/2026 TRSP - ROW - Final Passed Old Permit bypass has been removed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
SITE PLAN_V1.PDF DOCUMENTS VIEW
TRAFFIC CONTROL_V1.PDF DOCUMENTS VIEW