Permit: TR-ROW-0426-00511
Permit Details
Apply Date:
04/29/2026
Applicant:
Erica Goldston
Description:
The work under this Section shall consist of the care of all planted stock in conformance with accepted horticultural practices and the GSI Maintenance. This work does require some excavation. We will also have some landscaping work to do along with applying all irrigation water / system. Repair of earthwork and adjacent to landscape areas and the testing adjusting repairing and operating of the irrigation.
Permit Reviews
Permit Number - TR-ROW-0426-00511
Permit Status: Needs resubmittal
Permit Description: The work under this Section shall consist of the care of all planted stock in conformance with accepted horticultural practices and the GSI Maintenance. This work does require some excavation.
We will also have some landscaping work to do along with applying all irrigation water / system. Repair of earthwork and adjacent to landscape areas and the testing adjusting repairing and operating of the irrigation.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/29/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/14/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0426-00511
Permit Status: Needs resubmittal
Permit Description: The work under this Section shall consist of the care of all planted stock in conformance with accepted horticultural practices and the GSI Maintenance. This work does require some excavation.
We will also have some landscaping work to do along with applying all irrigation water / system. Repair of earthwork and adjacent to landscape areas and the testing adjusting repairing and operating of the irrigation.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 05/01/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/01/2026 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. |
| 05/01/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/01/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/01/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 05/04/2026 | The following extended traffic control set-up times were approved: 24 hr. |
| 05/12/2026 | Hunter work shall not inhibit Prop 411 curb access ramp improvements |