Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
5727 E 5TH ST
Address NEW:
5727 E 5TH ST
Apply Date:
04/24/2026
Applicant:
CAITLIN RIPLEY - SOUTHWEST BARRICADES
Description:
Sidewalk Repair

Permit Reviews

Permit Number - TR-ROW-0426-00494
Permit Status: Complete
Permit Description: Sidewalk Repair
Start Date Submittal Complete Date Status  
04/24/2026 RIGHT-OF-WAY REVIEW v.1 N/A REQUIRES RESUBMIT Review Details
04/29/2026 RIGHT-OF-WAY REVIEW v.2 05/05/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0426-00494
Permit Status: Complete
Permit Description: Sidewalk Repair
Total Outstanding Activity Conditions - 6
Date Name
04/30/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
04/30/2026 Traffic control set-up approved between 9AM - 3:30PM
04/30/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/30/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
04/30/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
04/30/2026 PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALKS PANELS PER PAG STANDARD DETAIL 200/206

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0426-00494
Permit Description: Sidewalk Repair
Total Completed Inspections - 5
Date Description Inspector Results Comments
05/18/2026 TRSP - ROW - Barricade - Setup/Routine Passed
05/18/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/18/2026 TRSP - ROW - Final Passed
05/18/2026 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed
05/18/2026 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
5727 E 5TH TRAFFFICPLAN.JPG_V1.PDF DOCUMENTS VIEW
5727 E 5TH_V1.PDF DOCUMENTS VIEW
ROW VIOLATION 5TH_V1.PDF DOCUMENTS VIEW