Permit: TR-ROW-0426-00485
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4550 E FORT LOWELL RD
Address NEW:
4550 E FORT LOWELL RD
Apply Date:
04/24/2026
Applicant:
ALICIA OROZCO
Description:
1-40 yrd roll off to be delivered on 05/01 and removed on 5/04
Permit Reviews
Permit Number - TR-ROW-0426-00485
Permit Status: Complete
Permit Description: 1-40 yrd roll off to be delivered on 05/01 and removed on 5/04
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/24/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0426-00485
Permit Status: Complete
Permit Description: 1-40 yrd roll off to be delivered on 05/01 and removed on 5/04
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 04/24/2026 | The following extended traffic control set-up times were approved: 24hr Placement |
| 04/24/2026 | 24 Hours with barricades at PODS REQUIRED AT ALL TIMES For Roll off (Big Trash Can in the Right Away) 1) Roll-offs or dumpsters shall be located in areas that are not within a drainageway, storm runoff flow line, or obstructing stormdrain infrastructure. 2) Roll-offs or dumpsters shall keep lids on so that roll-off or dumpster is kept covered when not in use. Plugs shall be kept in place. 3) Roll-offs or dumpsters that have openings at sides shall have sealed side door flaps that are kept closed so that waste liquids do not leave container. 4) Damaged containers shall be reported for replacement. |
| 04/24/2026 | ** Pre- Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0426-00485
Permit Description: 1-40 yrd roll off to be delivered on 05/01 and removed on 5/04
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/27/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/27/2026 | TRSP - ROW - Final | Passed |