Permit: TR-ROW-0426-00479
Permit Details
Apply Date:
04/23/2026
Applicant:
Description:
Installation of monitoring well in the ROW for ADEQ groundwater project. 06/10/2026 - Request for 60 Day Renewal as 06/25/2026
Permit Reviews
Permit Number - TR-ROW-0426-00479
Permit Status: Complete
Permit Description: Installation of monitoring well in the ROW for ADEQ groundwater project.
06/10/2026 - Request for 60 Day Renewal as 06/25/2026
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/28/2026 | RIGHT-OF-WAY REVIEW v.2 | 04/29/2026 | APPROVED |
| 04/23/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/27/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0426-00479
Permit Status: Complete
Permit Description: Installation of monitoring well in the ROW for ADEQ groundwater project.
06/10/2026 - Request for 60 Day Renewal as 06/25/2026
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/23/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |
| 04/23/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 04/23/2026 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 04/23/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 04/30/2026 | The following extended traffic control set-up times were approved: 24 hr closure. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0426-00479
Permit Description: Installation of monitoring well in the ROW for ADEQ groundwater project.
06/10/2026 - Request for 60 Day Renewal as 06/25/2026
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | digging a well archaeological on site for the first 20 feet of the well and this is for a monitoring well with a sleeve | |
| 06/22/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/07/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | well rig broke down, waiting for parts. Hopefully they’ll be done by July 3. Yes for a PPHAS WELL monitor site all back fill complete for this site site will remain active until they can verify the samples from the dirt and from their spoiled piles are clear of PPHAS THE DUMPSTER COULD BE THERE FOR A MONTH OR LONGER. THERE WILL BE MONITORING THE PERMIT ACCORDINGLY. | |
| 08/20/2026 | TRSP - ROW - Final | Passed | 24 inch core for a monitoring well all work completed |