Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
3120 N SHAWNEE AV
Apply Date:
04/23/2026
Applicant:
Description:
Installation of monitoring well in the ROW for ADEQ groundwater project. 06/10/2026 - Request for 60 Day Renewal as 06/25/2026

Permit Reviews

Permit Number - TR-ROW-0426-00479
Permit Status: Complete
Permit Description: Installation of monitoring well in the ROW for ADEQ groundwater project. 06/10/2026 - Request for 60 Day Renewal as 06/25/2026
Start Date Submittal Complete Date Status  
04/28/2026 RIGHT-OF-WAY REVIEW v.2 04/29/2026 APPROVED Review Details
04/23/2026 RIGHT-OF-WAY REVIEW v.1 04/27/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0426-00479
Permit Status: Complete
Permit Description: Installation of monitoring well in the ROW for ADEQ groundwater project. 06/10/2026 - Request for 60 Day Renewal as 06/25/2026
Total Outstanding Activity Conditions - 5
Date Name
04/23/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
04/23/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
04/23/2026 PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
04/23/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
04/30/2026 The following extended traffic control set-up times were approved: 24 hr closure.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0426-00479
Permit Description: Installation of monitoring well in the ROW for ADEQ groundwater project. 06/10/2026 - Request for 60 Day Renewal as 06/25/2026
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/18/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed digging a well archaeological on site for the first 20 feet of the well and this is for a monitoring well with a sleeve
06/22/2026 TRSP - ROW - Barricade - Setup/Routine Passed
07/07/2026 TRSP - ROW - Backfill - Placement/Compaction Passed well rig broke down, waiting for parts. Hopefully they’ll be done by July 3. Yes for a PPHAS WELL monitor site all back fill complete for this site site will remain active until they can verify the samples from the dirt and from their spoiled piles are clear of PPHAS THE DUMPSTER COULD BE THERE FOR A MONTH OR LONGER. THERE WILL BE MONITORING THE PERMIT ACCORDINGLY.
08/20/2026 TRSP - ROW - Final Passed 24 inch core for a monitoring well all work completed

Documents

File Name Document Type  
2023018002A-BH-3 R4_V1.PDF DOCUMENTS VIEW
2023018004A-BH-3 R1_V1.PDF DOCUMENTS VIEW
EXECUTED COT IRA3 AGREEMENT_V1.PDF DOCUMENTS VIEW
HYDRO GEO - 1445 W DELANO DR - ONE WAY WB CL PLAN 1 - BH-3 R1_V2.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW