Permit: TR-ROW-0426-00462
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
5400 S CANADA DR
Address NEW:
5400 S CANADA DR
Apply Date:
04/22/2026
Applicant:
ANGEL MORALES
Description:
CIPP and Replace existing concrete collars
Permit Reviews
Permit Number - TR-ROW-0426-00462
Permit Status: Inspections
Permit Description: CIPP and Replace existing concrete collars
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/22/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/23/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0426-00462
Permit Status: Inspections
Permit Description: CIPP and Replace existing concrete collars
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/22/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 04/22/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 04/22/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 04/22/2026 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0426-00462
Permite Description: CIPP and Replace existing concrete collars
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2026 | TRSP - ROW - Final | N/A | Partial Pass |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ROW-0426-00462
Permit Description: CIPP and Replace existing concrete collars
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | on-site meeting with Sergio, job start is still a couple of weeks away waiting for Jensen precast parts, flyer notifications to be distributed five days prior to start | |
| 05/27/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/16/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed |