Permit: TR-ROW-0426-00433
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2210 E LA MADERA DR
Address NEW:
2210 E LA MADERA DR
Apply Date:
04/14/2026
Applicant:
Dan Padilla
Description:
Air-Vacuum Excavation of 62 utility potholes for the design phase of Tucson Water CIP Project No. PJR001202 Shaheen Estates Waterline Replacement
Permit Reviews
Permit Number - TR-ROW-0426-00433
Permit Status: Complete
Permit Description: Air-Vacuum Excavation of 62 utility potholes for the design phase of Tucson Water CIP Project No. PJR001202 Shaheen Estates Waterline Replacement
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/15/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/21/2026 | REQUIRES RESUBMIT |
| 05/14/2026 | RIGHT-OF-WAY REVIEW v.4 | 05/18/2026 | APPROVED |
| 05/11/2026 | RIGHT-OF-WAY REVIEW v.3 | 05/11/2026 | REQUIRES RESUBMIT |
| 04/29/2026 | RIGHT-OF-WAY REVIEW v.2 | 05/11/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0426-00433
Permit Status: Complete
Permit Description: Air-Vacuum Excavation of 62 utility potholes for the design phase of Tucson Water CIP Project No. PJR001202 Shaheen Estates Waterline Replacement
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 04/16/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 04/16/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/16/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 05/18/2026 | Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices. |
| 05/18/2026 | Coordination - The contractor shall coordinate all construction activities and traffic control with other active projects and traffic control operations in the area. Traffic control shall be adjusted as necessary to avoid conflicts and maintain safe traffic flow. |
| 05/18/2026 | Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 05/18/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 05/18/2026 | Neighborhood work - The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0426-00433
Permit Description: Air-Vacuum Excavation of 62 utility potholes for the design phase of Tucson Water CIP Project No. PJR001202 Shaheen Estates Waterline Replacement
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | See uploads, and or photos of location for pothole for Tucson water project his project will be starting sometime around August of this year | |
| 06/11/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | coring for a Tucson water project that is supposed to start within the next couple of months prior to the 411 coming through. I’ve already put back 90% of the course. | |
| 07/16/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/16/2026 | TRSP - ROW - Final | Passed | All cores in potholes have been replaced and patched For depth verifications for utilities for the new Tucson water project prior to the 411 going through |