Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW)
Address NEW:
3002 S MISSION RD
Apply Date:
04/10/2026
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
New Waterline - Across 3 lanes, two seperate TCPs

Permit Reviews

Permit Number - TR-ROW-0426-00419
Permit Status: Needs resubmittal
Permit Description: New Waterline - Across 3 lanes, two seperate TCPs
Start Date Submittal Complete Date Status  
04/28/2026 RIGHT-OF-WAY REVIEW v.2 04/29/2026 REQUIRES RESUBMIT Review Details
04/13/2026 RIGHT-OF-WAY REVIEW v.1 04/15/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0426-00419
Permit Status: Needs resubmittal
Permit Description: New Waterline - Across 3 lanes, two seperate TCPs
Total Outstanding Activity Conditions - 6
Date Name
04/14/2026 Traffic control set-up approved between 9AM - 3:30PM
04/14/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/29/2026 All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
04/29/2026 Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.
04/29/2026 Pedestrian Access – Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices.
04/29/2026 The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period

Documents