Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW)
Address:
5860 E 22ND ST
Address NEW:
5860 E 22ND ST
Apply Date:
04/07/2026
Applicant:
Andres Amado
Description:
*CONTINUATION OF PERMIT TR-ROW-0525-00586* & *TR-ROW-1125-01387* Neighborhood waterline rehabilitation including all new main lines, services, private plumbing, hydrants, and asphalt patches. Final still needs to be approved on permit TR-ROW-0525-00586.

Permit Reviews

Permit Number - TR-ROW-0426-00403
Permit Status: Inspections
Permit Description: *CONTINUATION OF PERMIT TR-ROW-0525-00586* & *TR-ROW-1125-01387* Neighborhood waterline rehabilitation including all new main lines, services, private plumbing, hydrants, and asphalt patches. Final still needs to be approved on permit TR-ROW-0525-00586.
Start Date Submittal Complete Date Status  
04/07/2026 RIGHT-OF-WAY REVIEW v.1 04/08/2026 REQUIRES RESUBMIT Review Details
04/09/2026 RIGHT-OF-WAY REVIEW v.2 04/09/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0426-00403
Permit Status: Inspections
Permit Description: *CONTINUATION OF PERMIT TR-ROW-0525-00586* & *TR-ROW-1125-01387* Neighborhood waterline rehabilitation including all new main lines, services, private plumbing, hydrants, and asphalt patches. Final still needs to be approved on permit TR-ROW-0525-00586.
Total Outstanding Activity Conditions - 5
Date Name
04/08/2026 1. Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2. Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3. Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4. Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
04/08/2026 Traffic control set-up approved between 9AM - 3:30PM
04/08/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/08/2026 PER MUTCD PROPER ADVANCED WARNING SIGNS AHEAD ARE REQUIRED. PEDESTRAIN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
04/09/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0426-00403
Permite Description: *CONTINUATION OF PERMIT TR-ROW-0525-00586* & *TR-ROW-1125-01387* Neighborhood waterline rehabilitation including all new main lines, services, private plumbing, hydrants, and asphalt patches. Final still needs to be approved on permit TR-ROW-0525-00586.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/26/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Re-inspection required awaiting update from contractor

Completed Inspections

Permit Status: Inspections
Permit Number: TR-ROW-0426-00403
Permit Description: *CONTINUATION OF PERMIT TR-ROW-0525-00586* & *TR-ROW-1125-01387* Neighborhood waterline rehabilitation including all new main lines, services, private plumbing, hydrants, and asphalt patches. Final still needs to be approved on permit TR-ROW-0525-00586.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/14/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed on-site meeting with Foreman Jose, job is a continuation from previous permit. Main waterline is in place, with crossings for services in progress. Temporary asphalt is in place currently, permanent patching approximately two weeks out.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
17 SURVEY CONTROL SHEET_V1.PDF DOCUMENTS VIEW
AERIAL_V1.PDF DOCUMENTS VIEW
MODEL_V1 (1)_V2.PDF DOCUMENTS VIEW
TCP 22ND_V1 (2)_V1.PDF DOCUMENTS VIEW
TRENCHING NOTES FOR SAN PAULO VILLAGE PH 2B_V1.PDF DOCUMENTS VIEW