Permit: TR-ROW-0425-00562
Permit Details
Apply Date:
04/28/2025
Applicant:
Andrew Ruiz
Description:
Installation of a new water main for the new Sequoia Apartments 6/9/2025- renewal for 90 days
Permit Reviews
Permit Number - TR-ROW-0425-00562
Permit Status: Complete
Permit Description:
Installation of a new water main for the new Sequoia Apartments
6/9/2025- renewal for 90 days
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/07/2025 | RIGHT-OF-WAY REVIEW v.2 | 05/08/2025 | APPROVED |
| 04/29/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/30/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0425-00562
Permit Status: Complete
Permit Description:
Installation of a new water main for the new Sequoia Apartments
6/9/2025- renewal for 90 days
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/30/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 04/30/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/07/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. |
| 05/07/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/07/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0425-00562
Permit Description:
Installation of a new water main for the new Sequoia Apartments
6/9/2025- renewal for 90 days
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/09/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/25/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/12/2025 | TRSP - ROW - Final | Passed |