Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
38 S SCOTT AV
Address NEW:
38 S SCOTT AV
Apply Date:
04/28/2025
Applicant:
Bryan Guinee
Description:
The contractor will be installing cameras onto light poles for the Tucson Police Department. Shadow Truck. Less than an hour per location. 60 day Permit.

Permit Reviews

Permit Number - TR-ROW-0425-00559
Permit Status: Complete
Permit Description: The contractor will be installing cameras onto light poles for the Tucson Police Department. Shadow Truck. Less than an hour per location. 60 day Permit.
Start Date Submittal Complete Date Status  
04/29/2025 RIGHT-OF-WAY REVIEW v.1 05/01/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0425-00559
Permit Status: Complete
Permit Description: The contractor will be installing cameras onto light poles for the Tucson Police Department. Shadow Truck. Less than an hour per location. 60 day Permit.
Total Outstanding Activity Conditions - 5
Date Name
04/29/2025 PRE-CON/PAVEMENT/SIDEWALK
04/30/2025 The following extended traffic control set-up times were approved:
04/30/2025 OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP.
04/30/2025 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2.
04/30/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0425-00559
Permit Description: The contractor will be installing cameras onto light poles for the Tucson Police Department. Shadow Truck. Less than an hour per location. 60 day Permit.
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/30/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/30/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
MAP BROADWAY - STONE_V1.PDF DOCUMENTS VIEW
TCP_NEXT BROADWAY - STONE_V1.PDF DOCUMENTS VIEW