Permit: TR-ROW-0425-00557
Permit Details
Apply Date:
04/28/2025
Applicant:
Description:
The contractor will be installing cameras onto light poles for the Tucson Police Department. Shadow Truck less than an hour per location. 60-day Permit.
Permit Reviews
Permit Number - TR-ROW-0425-00557
Permit Status: Complete
Permit Description: The contractor will be installing cameras onto light poles for the Tucson Police Department. Shadow Truck less than an hour per location. 60-day Permit.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/29/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/01/2025 | REQUIRES RESUBMIT |
| 05/05/2025 | RIGHT-OF-WAY REVIEW v.2 | 05/06/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0425-00557
Permit Status: Complete
Permit Description: The contractor will be installing cameras onto light poles for the Tucson Police Department. Shadow Truck less than an hour per location. 60-day Permit.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 04/30/2025 | The following extended traffic control set-up times were approved: |
| 04/30/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 04/30/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0425-00557
Permit Description: The contractor will be installing cameras onto light poles for the Tucson Police Department. Shadow Truck less than an hour per location. 60-day Permit.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/16/2025 | TRSP - ROW - Final | Passed |