Permit: TR-ROW-0425-00506
Permit Details
Apply Date:
04/14/2025
Applicant:
Miguel Gonzalez
Description:
At existing Zayo HH locations an extra HH will be place. Begin at STA 0+00, by means pull through, pull fiber along existing Zayo conduits, with 288F micro cable. Place new Zayo HH at STA 1+10. Pull along Alameda St. to E Tools Ave. for approx. 1029' Place Zayo HH at STA 9+70. Resume pulling cable to STA 20+60. Place HH at STA 20+70. Resume pulling cable along existing ducts to STA 30+70. Place Zayo HH at STA 30+80, resume pulling cable to STA 44+90. Place Zayo HH at STA 45+00. Maintaince Permit: possible dig ups, for conduit crushed pipes. Archeology permit in process.
Permit Reviews
Permit Number - TR-ROW-0425-00506
Permit Status: Issued
Permit Description: At existing Zayo HH locations an extra HH will be place. Begin at STA 0+00, by means pull through, pull fiber along existing Zayo conduits, with 288F micro cable. Place new Zayo HH at STA 1+10. Pull along Alameda St. to E Tools Ave. for approx. 1029' Place Zayo HH at STA 9+70. Resume pulling cable to STA 20+60. Place HH at STA 20+70. Resume pulling cable along existing ducts to STA 30+70. Place Zayo HH at STA 30+80, resume pulling cable to STA 44+90. Place Zayo HH at STA 45+00. Maintaince Permit: possible dig ups, for conduit crushed pipes. Archeology permit in process.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/21/2025 | RIGHT-OF-WAY REVIEW v.2 | 04/28/2025 | REQUIRES RESUBMIT |
| 04/16/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/18/2025 | REQUIRES RESUBMIT |
| 10/16/2025 | RIGHT-OF-WAY REVIEW v.4 | 10/17/2025 | APPROVED |
| 10/06/2025 | RIGHT-OF-WAY REVIEW v.3 | 10/13/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0425-00506
Permit Status: Issued
Permit Description: At existing Zayo HH locations an extra HH will be place. Begin at STA 0+00, by means pull through, pull fiber along existing Zayo conduits, with 288F micro cable. Place new Zayo HH at STA 1+10. Pull along Alameda St. to E Tools Ave. for approx. 1029' Place Zayo HH at STA 9+70. Resume pulling cable to STA 20+60. Place HH at STA 20+70. Resume pulling cable along existing ducts to STA 30+70. Place Zayo HH at STA 30+80, resume pulling cable to STA 44+90. Place Zayo HH at STA 45+00. Maintaince Permit: possible dig ups, for conduit crushed pipes. Archeology permit in process.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/22/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/22/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 04/22/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 09/24/2025 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |
| 10/13/2025 | Your project work requires that you contact City of Tucson Park Tucson Department to alert them and coordinate work as needed in freight loading zones, parking garage access, areas with parking meters and/or other permitted parking areas. Notify Park Tucson (520-791-5071) at least 24 hours before starting work for any parking restrictions that may occur within the boundaries of South 22nd, North Speedway, West Grande and East Campbell. |