Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
4504 E 5TH ST
Address NEW:
4504 E 5TH ST
Apply Date:
04/14/2025
Applicant:
Erica Goldston
Description:
Hunter will remove 2ea sewer cleanouts and replace them with new 48" Terminal MH's.

Permit Reviews

Permit Number - TR-ROW-0425-00500
Permit Status: Complete
Permit Description: Hunter will remove 2ea sewer cleanouts and replace them with new 48" Terminal MH's.
Start Date Submittal Complete Date Status  
04/15/2025 RIGHT-OF-WAY REVIEW v.1 04/18/2025 APPROVED Review Details

Conditions

Permit Number - TR-ROW-0425-00500
Permit Status: Complete
Permit Description: Hunter will remove 2ea sewer cleanouts and replace them with new 48" Terminal MH's.
Date Description Comments
04/17/2025 BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
04/17/2025 Traffic control set-up approved between 9AM - 3:30PM
04/17/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-ROW-0425-00500
Permite Description: Hunter will remove 2ea sewer cleanouts and replace them with new 48" Terminal MH's.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/30/2025 TRSP - ROW - Final N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0425-00500
Permit Description: Hunter will remove 2ea sewer cleanouts and replace them with new 48" Terminal MH's.
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/23/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/30/2025 TRSP - ROW - Barricade - Setup/Routine Passed
06/29/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
601 N BENTON AV_SITE MAP_V1.PDF DOCUMENTS VIEW
601 N BENTON AV_TCP_V1.PDF DOCUMENTS VIEW