Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Apply Date:
04/08/2025
Applicant:
Erica Goldston
Description:
8" CIPP Lining, AC Trenching for Sewer Bypass. Traffic Control will be in phases to cross 5th St with Bypass Trenching.

Permit Reviews

Permit Number - TR-ROW-0425-00465
Permit Status: Complete
Permit Description: 8" CIPP Lining, AC Trenching for Sewer Bypass. Traffic Control will be in phases to cross 5th St with Bypass Trenching.
Start Date Submittal Complete Date Status  
04/09/2025 RIGHT-OF-WAY REVIEW v.1 04/16/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0425-00465
Permit Status: Complete
Permit Description: 8" CIPP Lining, AC Trenching for Sewer Bypass. Traffic Control will be in phases to cross 5th St with Bypass Trenching.
Total Outstanding Activity Conditions - 2
Date Name
04/14/2025 BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
04/14/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0425-00465
Permit Description: 8" CIPP Lining, AC Trenching for Sewer Bypass. Traffic Control will be in phases to cross 5th St with Bypass Trenching.
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/19/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/24/2025 TRSP - ROW - Barricade - Setup/Routine Passed
07/24/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
500 N EL CMO DEL NORTE_SITE MAP_V1.PDF DOCUMENTS VIEW
500 N EL CMO DEL NORTE_TCP_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW