Permit: TR-ROW-0425-00465
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
500 N EL CAMINO DEL NORTE
Address NEW:
500 N EL CAMINO DEL NORTE
Apply Date:
04/08/2025
Applicant:
Erica Goldston
Description:
8" CIPP Lining, AC Trenching for Sewer Bypass. Traffic Control will be in phases to cross 5th St with Bypass Trenching.
Permit Reviews
Permit Number - TR-ROW-0425-00465
Permit Status: Complete
Permit Description: 8" CIPP Lining, AC Trenching for Sewer Bypass. Traffic Control will be in phases to cross 5th St with Bypass Trenching.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/09/2025 | RIGHT-OF-WAY REVIEW v.1 | 04/16/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0425-00465
Permit Status: Complete
Permit Description: 8" CIPP Lining, AC Trenching for Sewer Bypass. Traffic Control will be in phases to cross 5th St with Bypass Trenching.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/14/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 04/14/2025 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0425-00465
Permit Description: 8" CIPP Lining, AC Trenching for Sewer Bypass. Traffic Control will be in phases to cross 5th St with Bypass Trenching.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/24/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/24/2025 | TRSP - ROW - Final | Passed |