Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
7655 S KOLB RD
Address NEW:
7655 S KOLB RD
Apply Date:
04/08/2025
Applicant:
ANGEL MORALES
Description:
Install water line 120’L X 4’W X 60”D. 24hrs shoulder closure.***

Permit Reviews

Permit Number - TR-ROW-0425-00455
Permit Status: Complete
Permit Description: Install water line 120’L X 4’W X 60”D. 24hrs shoulder closure.***
Start Date Submittal Complete Date Status  
04/11/2025 RIGHT-OF-WAY REVIEW v.1 04/18/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0425-00455
Permit Status: Complete
Permit Description: Install water line 120’L X 4’W X 60”D. 24hrs shoulder closure.***
Total Outstanding Activity Conditions - 5
Date Name
04/15/2025 Traffic control set-up approved between 9AM - 3:30PM
04/15/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/17/2025 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way.
04/17/2025 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
04/17/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0425-00455
Permit Description: Install water line 120’L X 4’W X 60”D. 24hrs shoulder closure.***
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/15/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed on-site meeting with Peter from Lloyd construction, Jamie from AWP, Janc construction, and myself. Work hours extended to begin at 5am. TCP is being resubmitted to reflect a reduction in speed and a 24hr setup. Work to begin Tuesday 07-22-25.
07/23/2025 TRSP - ROW - Barricade - Setup/Routine Passed
11/24/2025 TRSP - ROW - Paving - Subgrade/removal/placement Passed Work was completed under a new permit number
TR-ROW-0925-01157
11/24/2025 TRSP - ROW - Final Passed Work was completed under a new permit number
TR-ROW-0925-01157

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
C101_ SITE PLAN REV.1_V1.PDF DOCUMENTS VIEW
LLOYD CON - KOLB RD CAMINO BOLEADORAS - TCP2_V1.PDF DOCUMENTS VIEW
LLOYD CON - KOLB RD CAMINO BOLEADORAS - TCP3_V1.PDF DOCUMENTS VIEW
LLOYD CON - KOLB RD - CAMINO BOLEADORAS - SHOULDER CL - TPD ANNEX_V1.PDF DOCUMENTS VIEW