Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2500 N ORACLE RD
Address NEW:
2500 N ORACLE RD
Apply Date:
04/29/2024
Applicant:
Bob Roggenthen
Description:
The contractor will be installing a New Hawk Pedestrian Signal for the City of Tucson under the J.O.C. Removal of the ramps will be needed on the S.E.C. & S.W.C to replace with new ADA compliance ramps. Temporary ADA ramp & sidewalk will be available for pedestrians 24 hours. (Right lane closures will be for 24 hours)

Permit Reviews

Permit Number - TR-ROW-0424-00497
Permit Status: Complete
Permit Description: The contractor will be installing a New Hawk Pedestrian Signal for the City of Tucson under the J.O.C. Removal of the ramps will be needed on the S.E.C. & S.W.C to replace with new ADA compliance ramps. Temporary ADA ramp & sidewalk will be available for pedestrians 24 hours. (Right lane closures will be for 24 hours)
Start Date Submittal Complete Date Status  
05/13/2025 RIGHT-OF-WAY REVIEW v.3 05/13/2025 APPROVED Review Details
04/14/2025 RIGHT-OF-WAY REVIEW v.2 05/12/2025 REQUIRES RESUBMIT Review Details
04/29/2024 RIGHT-OF-WAY REVIEW v.1 04/07/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0424-00497
Permit Status: Complete
Permit Description: The contractor will be installing a New Hawk Pedestrian Signal for the City of Tucson under the J.O.C. Removal of the ramps will be needed on the S.E.C. & S.W.C to replace with new ADA compliance ramps. Temporary ADA ramp & sidewalk will be available for pedestrians 24 hours. (Right lane closures will be for 24 hours)
Total Outstanding Activity Conditions - 4
Date Name
04/30/2024 Traffic control set-up approved between 9AM - 3:30PM
04/30/2024 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/30/2024 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206
04/30/2024 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0424-00497
Permit Description: The contractor will be installing a New Hawk Pedestrian Signal for the City of Tucson under the J.O.C. Removal of the ramps will be needed on the S.E.C. & S.W.C to replace with new ADA compliance ramps. Temporary ADA ramp & sidewalk will be available for pedestrians 24 hours. (Right lane closures will be for 24 hours)
Total Completed Inspections - 6
Date Description Inspector Results Comments
05/30/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/09/2025 TRSP - ROW - Barricade - Setup/Routine Passed
08/12/2025 TRSP - ROW - Barricade Takedown Passed
08/12/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
08/12/2025 TRSP - ROW - Final/Close-Out Passed
08/12/2025 TRSP - ROW - AERIAL INSTALLATION Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW