Permit: TR-ROW-0424-00490
Permit Details
Apply Date:
04/29/2024
Applicant:
Benjamin Lozano
Description:
I need a bike lane closure and to shift the sidewalk for Paving work.
Permit Reviews
Permit Number - TR-ROW-0424-00490
Permit Status: Complete
Permit Description: I need a bike lane closure and to shift the sidewalk for Paving work.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/02/2024 | RIGHT-OF-WAY REVIEW v.2 | 05/06/2024 | APPROVED |
04/29/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/01/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0424-00490
Permit Status: Complete
Permit Description: I need a bike lane closure and to shift the sidewalk for Paving work.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
04/29/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
04/29/2024 | Traffic control set-up approved between 9AM - 3:30PM |
04/29/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0424-00490
Permit Description: I need a bike lane closure and to shift the sidewalk for Paving work.
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/08/2024 | TRSP - ROW - SITE INSPECTION | Passed | asphalt being placed per specs. no rolling pattern or testing. | |
06/06/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
06/06/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
06/06/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
06/06/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
06/06/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
12/11/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | no concrete, job completed | |
12/11/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | no concrete, job completed |