Permit: TR-ROW-0424-00487
Permit Details
Apply Date:
04/29/2024
Applicant:
DOONE BAKER
Description:
Previously had ROW permits during covid and the project was put on hold. I will attach all the previous paperwork i had. The Project is for installing Cathodic Protection rectifiers for Tucson Water. These areas had previous work completed (Drilling) and now just require trenching and cabinet install.
Permit Reviews
Permit Number - TR-ROW-0424-00487
Permit Status: Fees due
Permit Description: Previously had ROW permits during covid and the project was put on hold. I will attach all the previous paperwork i had. The Project is for installing Cathodic Protection rectifiers for Tucson Water. These areas had previous work completed (Drilling) and now just require trenching and cabinet install.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/23/2024 | RIGHT-OF-WAY REVIEW v.3 | 05/29/2024 | APPROVED |
04/29/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/29/2024 | REQUIRES RESUBMIT |
05/01/2024 | RIGHT-OF-WAY REVIEW v.2 | 05/07/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0424-00487
Permit Status: Fees due
Permit Description: Previously had ROW permits during covid and the project was put on hold. I will attach all the previous paperwork i had. The Project is for installing Cathodic Protection rectifiers for Tucson Water. These areas had previous work completed (Drilling) and now just require trenching and cabinet install.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
04/29/2024 | Traffic control set-up approved between 9AM - 3:30PM |
04/29/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
04/29/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |