Permit: TR-ROW-0424-00465
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
2802 N ROSEMONT AV
Address NEW:
2802 N ROSEMONT AV
Apply Date:
04/24/2024
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
Place New Anchor
Permit Reviews
Permit Number - TR-ROW-0424-00465
Permit Status: Complete
Permit Description: Place New Anchor
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/24/2024 | RIGHT-OF-WAY REVIEW v.1 | 05/24/2024 | APPROVED |
Conditions
Permit Number - TR-ROW-0424-00465
Permit Status: Complete
Permit Description: Place New Anchor
| Date | Description | Comments |
|---|---|---|
| 04/24/2024 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. | |
| 04/24/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
| 05/23/2024 | AD Waiver provided. if any archaeological materials are encountered during construction, all ground disturbing activities must cease in the immediate vicinity of the discovery, and the Tucson Historic Preservation Office must be contacted to assess the find. | |
| 04/24/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0424-00465
Permit Description: Place New Anchor
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/11/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/11/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/11/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 07/11/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed |