Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ROW-0424-00412
Permit Details
Apply Date:
04/16/2024
Applicant:
Bradley Weindorf
Description:
5" main sewer line for the main building at Tucson High is believed to be collapsed in the street in the bus lane directly in front of the bus stop on sixth st. A 4' x 4' excavation is required in order to make repair and get the building for the high school flowing again.
Permit Reviews
Permit Number - TR-ROW-0424-00412
Permit Status: Complete
Permit Description: 5" main sewer line for the main building at Tucson High is believed to be collapsed in the street in the bus lane directly in front of the bus stop on sixth st. A 4' x 4' excavation is required in order to make repair and get the building for the high school flowing again.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/16/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0424-00412
Permit Status: Complete
Permit Description: 5" main sewer line for the main building at Tucson High is believed to be collapsed in the street in the bus lane directly in front of the bus stop on sixth st. A 4' x 4' excavation is required in order to make repair and get the building for the high school flowing again.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
04/16/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
04/16/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0424-00412
Permit Description: 5" main sewer line for the main building at Tucson High is believed to be collapsed in the street in the bus lane directly in front of the bus stop on sixth st. A 4' x 4' excavation is required in order to make repair and get the building for the high school flowing again.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/29/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
07/22/2024 | TRSP - ROW - SITE INSPECTION | Passed |