Permit: TR-ROW-0424-00373
Permit Details
Apply Date:
04/05/2024
Applicant:
Andres Amado
Description:
Excavation and repair of two broken water valves in the center left lane of westbound valencia
Permit Reviews
Permit Number - TR-ROW-0424-00373
Permit Status: Complete
Permit Description: Excavation and repair of two broken water valves in the center left lane of westbound valencia
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/05/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0424-00373
Permit Status: Complete
Permit Description: Excavation and repair of two broken water valves in the center left lane of westbound valencia
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
04/05/2024 | Traffic control set-up approved between 9AM - 3:30PM |
04/05/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
04/05/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
04/09/2024 | The following extended traffic control set-up times were approved: 24 HOURS |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0424-00373
Permite Description: Excavation and repair of two broken water valves in the center left lane of westbound valencia
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/14/2024 | TRSP - ROW - SITE INSPECTION | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0424-00373
Permit Description: Excavation and repair of two broken water valves in the center left lane of westbound valencia
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/12/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
06/27/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
06/27/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
06/27/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
06/27/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
06/27/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
06/27/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
06/27/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |