Permit: TR-ROW-0424-00370
Permit Details
Apply Date:
04/05/2024
Applicant:
BEN LOZANO
Description:
installation of conduit infrastructure to facilitate installation of fiber optic cabling. installation by directional boring. utility location potholing will be performed along entire path shown on drawings. from Alvord rd to weiding rd.
Permit Reviews
Permit Number - TR-ROW-0424-00370
Permit Status: Complete
Permit Description: installation of conduit infrastructure to facilitate installation of fiber optic cabling. installation by directional boring. utility location potholing will be performed along entire path shown on drawings. from Alvord rd to weiding rd.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/05/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/05/2024 | REQUIRES RESUBMIT |
04/05/2024 | RIGHT-OF-WAY REVIEW v.2 | 04/11/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0424-00370
Permit Status: Complete
Permit Description: installation of conduit infrastructure to facilitate installation of fiber optic cabling. installation by directional boring. utility location potholing will be performed along entire path shown on drawings. from Alvord rd to weiding rd.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
04/08/2024 | The following extended traffic control set-up times were approved: |
04/08/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
04/11/2024 | PRE-CON/PAVEMENT/SIDEWALK |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0424-00370
Permite Description: installation of conduit infrastructure to facilitate installation of fiber optic cabling. installation by directional boring. utility location potholing will be performed along entire path shown on drawings. from Alvord rd to weiding rd.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/23/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | |
07/23/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0424-00370
Permit Description: installation of conduit infrastructure to facilitate installation of fiber optic cabling. installation by directional boring. utility location potholing will be performed along entire path shown on drawings. from Alvord rd to weiding rd.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/23/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
09/16/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
09/16/2024 | TRSP - ROW - Final/Close-Out | Passed |