Permit: TR-ROW-0423-00674
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
8702 E SPEEDWAY BL
Address NEW:
8702 E SPEEDWAY BL
Apply Date:
04/24/2023
Applicant:
Description:
Repair and replacement of approximately 32" of collapsed sewer line.
Permit Reviews
Permit Number - TR-ROW-0423-00674
Permit Status: Complete
Permit Description: Repair and replacement of approximately 32" of collapsed sewer line.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/01/2023 | RIGHT-OF-WAY REVIEW v.1 | 05/02/2023 | APPROVED |
| 04/25/2023 | RIGHT-OF-WAY REVIEW v.1 | 04/25/2023 | APPROVED |
Conditions
Permit Number - TR-ROW-0423-00674
Permit Status: Complete
Permit Description: Repair and replacement of approximately 32" of collapsed sewer line.
| Date | Description | Comments |
|---|---|---|
| 04/25/2023 | EMERGENCY AFTER THE FACT ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL * * PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
| 04/25/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0423-00674
Permit Description: Repair and replacement of approximately 32" of collapsed sewer line.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2023 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 06/20/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |