Permit: TR-ROW-0423-00658
Permit Details
Apply Date:
04/20/2023
Applicant:
Description:
Sewer Line Replacement : Excavation in Alley. **HOME IS OCCUPIED**
Permit Reviews
Permit Number - TR-ROW-0423-00658
Permit Status: Complete
Permit Description: Sewer Line Replacement : Excavation in Alley.
**HOME IS OCCUPIED**
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/24/2023 | RIGHT-OF-WAY REVIEW v.1 | 04/24/2023 | APPROVED |
Conditions
Permit Number - TR-ROW-0423-00658
Permit Status: Complete
Permit Description: Sewer Line Replacement : Excavation in Alley.
**HOME IS OCCUPIED**
| Date | Description | Comments |
|---|---|---|
| 04/24/2023 | EMERGENCY AFTER THE FACT ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL * * PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
| 04/24/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0423-00658
Permite Description: Sewer Line Replacement : Excavation in Alley.
**HOME IS OCCUPIED**
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0423-00658
Permit Description: Sewer Line Replacement : Excavation in Alley.
**HOME IS OCCUPIED**
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2023 | TRSP - ROW - SITE INSPECTION | Passed |