Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
3333 N SILVERBELL RD
Apply Date:
04/20/2023
Applicant:
Dan Padilla
Description:
Air Vacuum Excavation of 3 utility potholes for the design phase of Tucson Water Silverbell Road: El Camino del Cerro to Goret Rd Water System Modifications Project

Permit Reviews

Permit Number - TR-ROW-0423-00656
Permit Status: Complete
Permit Description: Air Vacuum Excavation of 3 utility potholes for the design phase of Tucson Water Silverbell Road: El Camino del Cerro to Goret Rd Water System Modifications Project
Start Date Submittal Complete Date Status  
04/21/2023 RIGHT-OF-WAY REVIEW v.1 05/11/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0423-00656
Permit Status: Complete
Permit Description: Air Vacuum Excavation of 3 utility potholes for the design phase of Tucson Water Silverbell Road: El Camino del Cerro to Goret Rd Water System Modifications Project
Total Outstanding Activity Conditions - 4
Date Name
04/26/2023 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
04/26/2023 Traffic control set-up approved between 9AM - 3:30PM
04/26/2023 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
05/11/2023 Pothole Coordination

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0423-00656
Permit Description: Air Vacuum Excavation of 3 utility potholes for the design phase of Tucson Water Silverbell Road: El Camino del Cerro to Goret Rd Water System Modifications Project
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/08/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/28/2023 TRSP - ROW - Final/Close-Out Passed
06/28/2023 TRSP - ROW - Recurring Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
TCP- AZ104-057-00 - N SILVERBELL RD AND NEOSHA ST - 23-0389_V1.PDF DOCUMENTS VIEW
SILVERBELL POTHOLES-MARKUP_V1.PDF DOCUMENTS VIEW