Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
1000 S RANDOLPH WY
Apply Date:
04/05/2023
Applicant:
Benjamin Lozano - Border Traffic Safety LLC
Description:
Installation of fiber optic cable for City Of Tucson. To be installed by directional boring.

Permit Reviews

Permit Number - TR-ROW-0423-00597
Permit Status: Complete
Permit Description: Installation of fiber optic cable for City Of Tucson. To be installed by directional boring.
Start Date Submittal Complete Date Status  
04/18/2023 RIGHT-OF-WAY REVIEW v.2 04/20/2023 APPROVED Review Details
04/05/2023 RIGHT-OF-WAY REVIEW v.1 04/07/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0423-00597
Permit Status: Complete
Permit Description: Installation of fiber optic cable for City Of Tucson. To be installed by directional boring.
Total Outstanding Activity Conditions - 2
Date Name
04/05/2023 The following extended traffic control set-up times were approved: 24 Shoulder Closure Barricade only
04/05/2023 Bus Stop/Route

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-ROW-0423-00597
Permite Description: Installation of fiber optic cable for City Of Tucson. To be installed by directional boring.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/20/2023 TRSP - ROW - Field Change Request N/A Complete (Recurring)
05/25/2023 TRSP - ROW - SITE INSPECTION N/A Complete (Recurring)

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0423-00597
Permit Description: Installation of fiber optic cable for City Of Tucson. To be installed by directional boring.
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/25/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
06/14/2023 TRSP - ROW - Final/Close-Out Passed
07/26/2023 TRSP - ROW - Recurring Passed