Permit: TR-ROW-0423-00597
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW)
Address:
1000 S RANDOLPH WY
Address NEW:
1000 S RANDOLPH WY
Apply Date:
04/05/2023
Applicant:
Benjamin Lozano
Description:
Installation of fiber optic cable for City Of Tucson. To be installed by directional boring.
Permit Reviews
Permit Number - TR-ROW-0423-00597
Permit Status: Complete
Permit Description: Installation of fiber optic cable for City Of Tucson. To be installed by directional boring.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/18/2023 | RIGHT-OF-WAY REVIEW v.2 | 04/20/2023 | APPROVED |
| 04/05/2023 | RIGHT-OF-WAY REVIEW v.1 | 04/07/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-ROW-0423-00597
Permit Status: Complete
Permit Description: Installation of fiber optic cable for City Of Tucson. To be installed by directional boring.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/05/2023 | The following extended traffic control set-up times were approved: 24 Shoulder Closure Barricade only |
| 04/05/2023 | Bus Stop/Route |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ROW-0423-00597
Permite Description: Installation of fiber optic cable for City Of Tucson. To be installed by directional boring.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2023 | TRSP - ROW - Field Change Request | N/A | Complete (Recurring) | |
| 05/25/2023 | TRSP - ROW - SITE INSPECTION | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ROW-0423-00597
Permit Description: Installation of fiber optic cable for City Of Tucson. To be installed by directional boring.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/14/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
| 07/26/2023 | TRSP - ROW - Recurring | Passed |