Permit Details

Status:
In Review
Type:
Right-of-Way (ROW)
Address:
115 S LINDA AV
Address NEW:
115 S LINDA AV
Apply Date:
03/30/2026
Applicant:
BRIAN MAJUTA JR - Quail Construction
Description:
The JOC is bringing our water line within 10 feet of our property line. Looking to pull this permit to complete the install of the water line into our property line. Permit TR-ROW-0126-00091 was pulled and now Permit TR-ROW-0326-00338 is pending for continuation of original ROW for closure of the area being worked on. This permit is strictly for the actual work being complete the TCP plan is in the permits mentioned above.

Permit Reviews

Permit Number - TR-ROW-0326-00366
Permit Status: In review
Permit Description: The JOC is bringing our water line within 10 feet of our property line. Looking to pull this permit to complete the install of the water line into our property line. Permit TR-ROW-0126-00091 was pulled and now Permit TR-ROW-0326-00338 is pending for continuation of original ROW for closure of the area being worked on. This permit is strictly for the actual work being complete the TCP plan is in the permits mentioned above.
Start Date Submittal Complete Date Status  
04/06/2026 RIGHT-OF-WAY REVIEW v.2 N/A IN REVIEW Review Details
03/31/2026 RIGHT-OF-WAY REVIEW v.1 N/A REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0326-00366
Permit Status: In review
Permit Description: The JOC is bringing our water line within 10 feet of our property line. Looking to pull this permit to complete the install of the water line into our property line. Permit TR-ROW-0126-00091 was pulled and now Permit TR-ROW-0326-00338 is pending for continuation of original ROW for closure of the area being worked on. This permit is strictly for the actual work being complete the TCP plan is in the permits mentioned above.
Total Outstanding Activity Conditions - 4
Date Name
04/06/2026 Traffic control set-up approved between 9AM - 3:30PM
04/06/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
04/06/2026 We have streetcar lines that run along this location. Sunlink will determine if there are any additional requirements for your request. This is done by a track access request using the following link: https://www.suntran.com/wp-content/uploads/2025/07/Track-Access-Permit-Request_Rev06-20220520.pdf
04/07/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.