Permit Details

Status:
Withdrawn
Type:
Right-of-Way (ROW)
Address NEW:
1802 W Saint Marys RD
Apply Date:
03/26/2026
Applicant:
Becky Hickox
Description:
Gas crossing in 2 spots on Camino Santiago: 1) at the alley south of Calle del Ocio (24' in pavement & 30' in dirt) and 2) at Calle Placida intersection (51' in pavement) 05/13/26- Renew permit for 30 days as of 05/15/26, new expiration date 06/14/26

Permit Reviews

Permit Number - TR-ROW-0326-00350
Permit Status: Withdrawn
Permit Description: Gas crossing in 2 spots on Camino Santiago: 1) at the alley south of Calle del Ocio (24' in pavement & 30' in dirt) and 2) at Calle Placida intersection (51' in pavement) 05/13/26- Renew permit for 30 days as of 05/15/26, new expiration date 06/14/26
Start Date Submittal Complete Date Status  
03/26/2026 RIGHT-OF-WAY REVIEW v.1 05/05/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0326-00350
Permit Status: Withdrawn
Permit Description: Gas crossing in 2 spots on Camino Santiago: 1) at the alley south of Calle del Ocio (24' in pavement & 30' in dirt) and 2) at Calle Placida intersection (51' in pavement) 05/13/26- Renew permit for 30 days as of 05/15/26, new expiration date 06/14/26
Total Outstanding Activity Conditions - 5
Date Name
04/02/2026 Traffic control set-up approved between 9AM - 3:30PM
05/05/2026 - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
05/05/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING
05/05/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/05/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Documents

File Name Document Type  
26-0016B_V1.PDF DOCUMENTS VIEW
26-0016_V1.PDF DOCUMENTS VIEW
26-0039B_V1.PDF DOCUMENTS VIEW
26-0039_V1.PDF DOCUMENTS VIEW
SW GAS PLANS-ALLEY SOUTH OF CALLE OCIO CALLE PLACIDA_V1.PDF DOCUMENTS VIEW