Permit: TR-ROW-0326-00335
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW)
Address:
10290 E TANQUE VERDE RD
Address NEW:
10290 E TANQUE VERDE RD
Apply Date:
03/23/2026
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
We are building a Circle K at this location and need the ROW permit to connect to sewer. 04/22/26- revision request for a traffic control plan for 24 hr TC closure
Permit Reviews
Permit Number - TR-ROW-0326-00335
Permit Status: Issued
Permit Description: We are building a Circle K at this location and need the ROW permit to connect to sewer.
04/22/26- revision request for a traffic control plan for 24 hr TC closure
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/21/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | 04/23/2026 | APPROVED |
| 03/24/2026 | RIGHT-OF-WAY REVIEW v.1 | 04/08/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ROW-0326-00335
Permit Status: Issued
Permit Description: We are building a Circle K at this location and need the ROW permit to connect to sewer.
04/22/26- revision request for a traffic control plan for 24 hr TC closure
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 03/26/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 03/26/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 03/26/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 04/01/2026 | - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |
| 04/01/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 04/01/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |
| 04/23/2026 | Bike access lane to be provided within TC Closure and maintain as a safe and clear area for safe movements for extend of Closure time. |
| 04/23/2026 | The following extended traffic control set-up times were approved: 24 hrs. |
Completed Inspections
Permit Status: Issued
Permit Number: TR-ROW-0326-00335
Permit Description: We are building a Circle K at this location and need the ROW permit to connect to sewer.
04/22/26- revision request for a traffic control plan for 24 hr TC closure
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/13/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |